Advice on buying a brand new home > Snagging and defects

opinions on brickwork

<< < (4/4)

pughster25:
Bloor Homes are shocking, trying to cut corners with repairs resulting in either a sub standard repair that requires doing again or further damage due to not doing the job the right way. i.e. not removing the doors to sand the door frames causing damage to the new polished hinges.

I have the contracts director coming round as I wasn't happy with the area manager's response on he thinks the consisently non uniform brickwork is acceptable :)

ibrick:
The standard of brickwork in some of your pictures is sadly being accepted in todays construction world (not in mine)

The standards in some of your pictures is certainly not acceptable at all, sadly the options for changing this would almost certainly create further issues with quality. Trying to hide brickwork repairs is very difficult.

Happy to comment in detail if you have other pictures.

pughster25:
I have lots of pictures which I will try and upload.
Bloors have since repaired the majority of the brickwork, after several arguments and been escalated to the managing directors.

New Home Expert:
Please don't fill up the database with lots of large pictures.
Just upload a couple of small file size  to demonstrate your point.

Navigation

[0] Message Index

[*] Previous page

Go to full version