Our new house (we complete soon) looks too low in the ground! We visit site a lot and noticed months ago that water was pooling against the front wall. The new path to the front door slopes down more than we were expecting and the soil level in the front garden and at the side is above the air bricks and DPC. We have not spoken to the builder yet (we are hesitant as we can't afford for the date to be re-set by 6 months, the house is already a year late) but it looks like panic may be setting in as the soil has just been dug away from the house and some crude wells have been created around two air bricks using kerb edging. See the pictures for more. We'd love some thoughts on the rights and wrongs of this - noting that the downstairs floor is concrete - and some advice on what to do or say next.